Brazil
The site brings together three hardwood vessels that operated from the 1960s until the mid-1980s, and the one in front of the pier carried cattle. With the formation of the Porto Primavera Hydroelectric Plant lake, vessels and buildings along the Presidente Epitácio waterfront were submerged. There is also a school of piranhas at the site.
Information on this page, including technical data such as depth, current, visibility, access, and recommended level, is informational and may vary. Confirm actual conditions with a local operator before the dive.
Tap to see what might appear on this dive
Reviews are from other divers — personal experiences, not guarantees.