Brazil
On the bottom lies the structure of the quay where ships operated from the 1960s until the 1990s. The old river port of Presidente Epitácio stopped in 1999, when the Porto Primavera Hydroelectric Plant (Engenheiro Sérgio Motta) began operating and its waters covered the port area; a new port was built afterwards. In Presidente Epitácio, part of the town ended up underwater with the construction of a hydroelectric plant on the border with Mato Grosso do Sul. The quay lies in an area of heavy boat traffic, which calls for a more precise dive at the site.
Information on this page, including technical data such as depth, current, visibility, access, and recommended level, is informational and may vary. Confirm actual conditions with a local operator before the dive.
Tap to see what might appear on this dive
Reviews are from other divers — personal experiences, not guarantees.